Range Method AI Brief Photo Brief Commission Share a project
§ 02 / CAPABILITIES

What we fabricate.

Six object families. Twenty-four product types. Each routed to the right combination of processes, materials, and ateliers across our production network.

ESTIMATE Envelope within 48 hours

Tables

OBJECTS Desk, Dining Table, Coffee Table, Bedside Table
PROCESS Wood, metal, stone, glass, resin, concrete
VOLUME 1 to 500 units (depending on the product)
LEAD TIME 4 to 16 weeks
FIG 02.1 — Tables

Seating

OBJECTS Bench, Sofa, Chair, Armchair, Stool
PROCESS Wood, metal, upholstery, molding
VOLUME 1 to 500 units (depending on the product)
LEAD TIME 4 to 16 weeks

Upholstered items (sofa, armchair) require detailed material specification for accurate estimation.

FIG 02.2 — Seating

Lighting

OBJECTS Wall Light, Table Lamp, Floor Lamp, Pendant
PROCESS Metal, glass, ceramic, LED integration
VOLUME 1 to 500 units (depending on the product)
LEAD TIME 4 to 16 weeks
FIG 02.3 — Lighting

Storage

OBJECTS Bar, Bookcase, Sideboard, Console
PROCESS Wood, metal, glass, stone
VOLUME 1 to 500 units (depending on the product)
LEAD TIME 4 to 16 weeks
FIG 02.4 — Storage

One brief. One team.

Every object is assessed, engineered, and produced through a single coordination layer, regardless of material, process, or production location. You send one brief. You receive one estimate. You deal with one project lead.

RESPONSE 48 hours
Share a project

Decor

OBJECTS Mirror, Screen
PROCESS Metal, glass, wood, stone, patination
VOLUME 1 to 500 units (depending on the product)
LEAD TIME 4 to 16 weeks
FIG 02.5 — Decor

Wall Coverings

Engineered

OBJECTS Wallpanel
PROCESS Wood, metal, stone, ceramic, 3D printing, CNC
VOLUME 1 to 500 units (depending on the product)
LEAD TIME 4 to 16 weeks

Printed and woven

OBJECTS Wallpaper, 3D Wallpaper (embossed), Textile, Art Print
PROCESS Wallpaper printing, textile printing, embossing, digital printing
VOLUME From 1 roll / 1 panel
LEAD TIME 1 to 6 weeks

Printed and woven items follow a separate production path with shorter lead times.

FIG 02.6 — Wall Coverings